Production Scheduling of William, Reeve Rattan, and Methuzella Rattan Wall Décor in Detalia Aurora Incorporated
Keywords:
production lead time, standard time, manpower, process, scheduleAbstract
Furniture manufacturing is a thriving industry that creates a wide range of goods for the customer, and it is also a significant area of concern for manufacturers and their customers around the world, with the common furniture production risks of it involves delivery delays, supply chain disruptions, changing user tastes, material price changes, cost overruns, labor shortages, or strikes. This study aims to identify and address potential production problems while manufacturing wall decors, such as delays, long production lead time, and dissatisfied consumers in Detalia Aurora Incorporated. The method addresses the organization’s production bottleneck using a qualitative research methodology. It creates a systematic production schedule using various data sources, such as process flow, standard time, manpower, and industrial engineering tools. Based on the findings and the conclusion, it is recommended to implement the proposed production schedule in Detalia Aurora Inc. to enhance current production in the company.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Delfa G. Castilla, Giles B. Almaden, Kyle G. Conde, Gilliana Eve Y. Arioja, Dreian A. Narte
This work is licensed under a Creative Commons Attribution 4.0 International License.