Planning, Scheduling, Budgeting and Tracking of a Multi-Storey Building Using Primavera P6

Authors

  • Pravinkumar Jagtap Assistant Professor, Department of Civil Engineering, A. P. Shah Institute of Technology, Thane, India
  • Chaitanya Patel Bachelor of Engineering, Department of Civil Engineering, A. P. Shah Institute of Technology, Thane, India
  • Lisha Raorane Bachelor of Engineering, Department of Civil Engineering, A. P. Shah Institute of Technology, Thane, India
  • Akshay Salunkhe Bachelor of Engineering, Department of Civil Engineering, A. P. Shah Institute of Technology, Thane, India
  • Vijay Walekar Bachelor of Engineering, Department of Civil Engineering, A. P. Shah Institute of Technology, Thane, India

Keywords:

planning, scheduling, cost estimation, budgeting, project management, Primavera P6

Abstract

Effective project management helps in achieving the aim of the project. Numerous issues are being confronted by the construction business, major of them are cost and time overrun. In the present practice for construction there is less awareness about software which helps in smooth management of construction as compared to conventional way of handling the project. To reduce the complexity of construction project various tools like Primavera P6, M.S project are effective project software tools used for proper planning, scheduling and detailed cost estimation of various activities, resources involved in the project. In this present study we have planned and schedule G+20 residential building and allocated the needed resources and after that we got the estimated cost of the construction. We have also tracked the progress of the project at various intervals of time. This paper tries to explain how effective is to plan, schedule, to estimate budget and tracked the progress of a G+20 residential building using Primavera P6 software.

Downloads

Download data is not yet available.

Downloads

Published

31-05-2022

Issue

Section

Articles

How to Cite

[1]
P. Jagtap, C. Patel, L. Raorane, A. Salunkhe, and V. Walekar, “Planning, Scheduling, Budgeting and Tracking of a Multi-Storey Building Using Primavera P6”, IJRESM, vol. 5, no. 5, pp. 220–228, May 2022, Accessed: Nov. 21, 2024. [Online]. Available: https://journal.ijresm.com/index.php/ijresm/article/view/2101

Most read articles by the same author(s)